Bridge of Don · AB23 · 35 mi from Aboyne

Telehandler Training in Bridge of Don

telehandler training on your Bridge of Don (AB23) site. 35 mi from Aboyne, ~55 mins via A90. Call 07867 933 018 for a free quote.

FAQs

How far do you travel to Bridge of Don?
35 road miles from our Aboyne (AB34) base, ~55 mins via A90. Short travel is why single-operator cohorts in Bridge of Don are still economic for us to run.
Which regulations does telehandler map to here?
LOLER 1998 and PUWER 1998. We print the mapping on the evidence pack so the construction client or principal contractor can tie the certificate to the reg they cited.
Is this course right for site teams?
It's built for that buyer profile. The paperwork and cohorting are tuned to what site teams are usually measured on.
Is telehandler accredited?
Yes — accredited certificates aligned with LOLER 1998 and PUWER 1998 are issued to successful candidates.
Is it worth running a cohort for 1–2 operators?
Yes — small cohorts work in Bridge of Don because travel from Aboyne is short. We don't charge a minimum-headcount premium.

Why teams in Bridge of Don book this

Telehandler Training for telehandler in Bridge of Don needs to clear three bars at once: LOLER 1998 and PUWER 1998, LOLER 1998. That's how we structure the day — practical assessment on your kit, paperwork that survives audit.

Bridge of Don on the ground: Northern Aberdeen distribution and light-industrial belt. Typical buildings: warehousing, light industrial units, distribution depots.

From Aboyne base

35 mi · ~55 mins via A90

Postcode

AB23

Council

Aberdeen City

Nearest A-road

A90

Local employers we work alongside

  • Murcar Commercial Park
  • Bridge of Don Industrial Estate
  • Denmore Industrial Estate

What the course covers

  • Boom control, load charts and stability
  • Attachment changes and lifting accessories
  • Travel with raised loads and uneven ground handling

Certification: Accredited telehandler operator certificate. Regs: LOLER 1998 and PUWER 1998.

Typical telehandler scenarios on Bridge of Don sites

  1. Scenario 1

    Lifting palletised blockwork to first-lift scaffold on a sloping plot

  2. Scenario 2

    Swapping bucket → forks → man-cage and re-checking the LOLER record

  3. Scenario 3

    Tele-handling round livestock or farm pedestrians without segregation

Audit findings this prevents

  • Operating outside the load chart because the boom angle was eyeballed
  • Forgetting that a man-cage requires a thorough examination every 6 months, not 12
  • Pulling away with a raised load on uneven ground — the top cause of tip-overs

Why this matters

30%

of UK construction plant fatalities involve telehandlers or excavators overturning.

Source: HSE construction fatal injuries report.

Related training pages

Or browse all training courses.

Off-season top-ups?

Quiet weeks are our best refresher slots — and the cheapest.